Call(239) 330-9836

Home / Commercial / New construction

New construction HVAC. Send the plans.

Homes, additions, offices, restaurants & retail, from slab to startup. Send the plans & most bids come back in 2 to 3 business days, itemized, so you can see what you're paying for.

How a bid goes

  1. You send the plans to info@aphexmechanical.com.
  2. We run the load calcs & lay out the duct on homes, or work from the engineer's mechanical drawings on commercial.
  3. You get an itemized bid in 2 to 3 business days: equipment, duct, grilles, controls, permit.
  4. Questions get answered by the people who'll do the work.

On the job

  • Rough in. Duct hung level & sealed on every seam, linesets & drains run before the walls close.
  • Trim. Grilles, diffusers & linears set straight, thermostats & controls.
  • Startup. Readings taken & written on every unit, tonnage, amps & volts labeled on the cabinet.
  • Closeout. Permit closed, warranty registered, paperwork to you & the owner.

Crane days & mechanical rooms

Rooftop units set in a morning, stands laid out before the crane shows up, mechanical rooms built so the next tech can read every cabinet. Inspectors notice.

Paperwork

Aphex Mechanical, LLC, Florida license CAC1824263. Licensed & insured, COI & W-9 the same day you ask. We pull the permit in Lee, Collier, Charlotte & Hendry & meet the inspector.

More from us: custom homes, restaurants, condos & HOAs, or all commercial work.

  • Some of it

    Crane dayCrane day at a new plaza in San Carlos. Josue hooking the boom, then up it goes.
  • RooftopLaying out stands before the units land. Crane day is the easy part when this part is right.
  • Mechanical roomFully labeled, installed to code. Tonnage, kW, amps & volts on every cabinet.
  • Mechanical roomSame mechanical room, other angle. Trunk cross broken, sealed on every seam, hung level.
  • Rough inTrunk & branches going in. This is where the comfort gets decided.
  • Rough inA return main on a lift. Before the ceiling closes.
  • TrimLinear cans, custom built, for mud in. Built before the drywall so the slot disappears into the ceiling.

Questions people ask

Most in 2 to 3 business days from the plans. Bigger jobs, we tell you the day up front.
On homes, yes, in house: load, equipment selection & duct layout. On commercial we build to the engineer's mechanical drawings & flag anything that won't work before it's built.
Same day you ask. Send the certificate holder info & it goes out with the W-9.
Lee, Collier, Charlotte & Hendry. Permit pulled, inspections met, permit closed.

Think comfort. Think Aphex.